After the flights this weekend, I put it back on the strap to fine tune the roll fans.
 

The power requirments for the control system are quit high. In Deland I had 12 volt batteries
everywhere and at the end of the day they were all dead.  To fly the Rig once requires 30-40 min
of charging for the 4 large control battery packs. This puts a 20 amp load on the 12 volt side. I made the
aluminum box around the biggest deap cycle I could find. Then mounted a 20-25 amp battery
charger right on top of it. Then mounted every charger I had on the door.  The aluminum box
is overkill but I had fun making it.
 
 

Zach and I are charging batteries.... again..